Over 35 years, we have delivered hundreds of projects in the energy, petrochemical, automotive and other industrial sectors, from the construction of new technological systems to servicing and major overhauls.
Installation of the Coalescer Unit
Slovnaft Montáže a opravy, s.r.o. · 2026
Servicing and maintenance of mechanical and technological equipment, Slovnaft heating plant
Slovnaft Montáže a opravy, s.r.o. · 2026
Construction of the new steam boiler BA111 at Slovnaft refinery
SAM Industries / PROVYKO · 2026
Supply and installation of compressed-air system, JLR Nitra Ph2
TAKENAKA EUROPE (for JLR Nitra) · 2026
Installation of compressed-air distribution systems, VOLVO Košice plant
TAKENAKA EUROPE (for VOLVO Košice) · 2026
Supply and installation of the main steam pipeline, Eco Power Project, Ružomberok
MONDI SCP, a.s. · 2026
General overhaul of the bottom section and economizer of Steam boiler K3
Slovnaft Montáže a opravy, s.r.o. · 2025
Supply and installation of the main compressed-air room system
TAKENAKA EUROPE (for VOLVO Košice) · 2025
Construction of a cooling centre and media distribution systems, Hall H1 Body-in-White, VW Bratislava
Volkswagen Slovakia, a.s. · 2023
Replacement of Column C6, Slovnaft refinery
SAM-Shipbuilding and Machinery · 2022
Intensification of the circulation centre CC5, Slovnaft
SAM-Shipbuilding and Machinery · 2022
Design, supply and installation of media piping systems for assembly hall H3a, VW Bratislava
Volkswagen Slovakia, a.s. · 2022
Installation of heat pipeline and transfer station, Bratislava
TAKENAKA EUROPE (Nová Cvernovka) · 2022
Replacement of the combustion chamber bottom of boiler K1
SLOVNAFT, a.s. · 2021
Replacement of the air preheater and economizer of boiler B6, Počerady power plant
Elektráreň Počerady · 2021
Suction and discharge piping for the initial filling pumps, Čierny Váh hydroelectric power plant
Slovenské elektrárne, a.s. · 2021
Installation of well completion equipment for hydraulic groundwater protection
SLOVNAFT, a.s. · 2018
Reconstruction of boiler K14, Třebovice power plant
Slovenské energetické strojárne, a.s. · 2018
Reconstruction of boilers 1 and 2, ENOB
Slovenské energetické strojárne, a.s. · 2017
Replacement of the boiler wall tube sections around the burner openings, boiler K3
Slovenské elektrárne, a.s. · 2016
Replacement of the second stage and the superheater
Žilinská teplárenská · 2013
Replacement of the boiler wall tube sections around the burner openings and of the third-stage steam superheater of boiler K3
Slovenské elektrárne, a.s. · 2013
Replacement of heavy fuel oil heat exchanger stations
Slovenské elektrárne, a.s. · 2011
Reconstruction of fuel handling systems for boiler K4
Martinská teplárenská · 2010
Reconstruction of boiler K4 for fluidized-biomass combustion, Martin
METSO POWER OY (Finland) · 2010
Conversion of the packaging plant for ECF production
Bukocel Hencovce · 2010
Installation of circulating-water heating, Zvolen
Zvolenská teplárenská · 2009
Automation of the return water pumping station
Zvolenská teplárenská · 2009
Installation of safety valves on columns C1 and C2
SLOVNAFT, a.s. · 2008
Complete reconstruction of heat transfer stations and replacement of hot-water pipelines
Bratislavská teplárenská · 2008
Reconstruction of heat exchanger stations for hot water heating
Martinská teplárenská · 2008